Once you have a solid hiring plan, you need a model to deliver it. Each growth phase brings its own bottleneck. Recognising yours early saves you time and money.
| Phase 1Founder-led | Phase 2First HR lead | Phase 3Structuring for scale | |
|---|---|---|---|
| Size (indicative) | up to 40 FTE | 40 to 80 FTE | 80 to 150+ FTE |
| Bottleneck | The founder doing it all themselves, or hiring a recruiter too early. | HR doing everything ‘on the side’, or calling an agency for every role. | Coordination and predictability, making it difficult to keep track of growth. |
| Hiring rhythm | One big wave after a growth moment, then silence | Growth waves plus a steady flow of replacements | A large base flow with peaks |
| Typical mistake | Doing it all yourself, or hiring a recruiter too early | HR does it all, or calls an agency for every role | Building a fixed team for the peak, and paying for it in the quiet months |
| The right capacity | Let someone else run the hiring wave from start to finish, so the founder can step back. Don’t build anything permanent yet. | The HR lead owns the process and the decisions. The execution can be done by someone else or externally. | Bring recruitment in-house and make it predictable. Only specialist roles and peaks go outside. |
How many hires can you really handle?
A hiring plan is only realistic if your team has the hours to deliver it. Most scale-ups plan around what the business needs. Very few check what the team can actually process.
40 to 60
Internal hours per role
Have you ever considered how many internal hours one vacancy will take? Including intake, sourcing, screening, interviews, and the offer. Count on 40 to 60 internal hours per role, and more for specialist roles. And that doesn’t include the onboarding your new hire needs to become successful quickly.
Multiply the roles in your hiring plan by the hours per hire, and set that against the hours your people really have. Six roles at 40 hours is 240 hours. If your team can free up ten hours a week, that’s six months of work.
And don’t underestimate what’s coming your way once your new colleagues actually start: onboarding matters just as much as making the right match. When your hiring peaks, make sure you’re ready to welcome every new person properly, not just in numbers but in how well they land.
Capacity that moves with your growth
Hiring doesn’t move in a straight line. It comes in waves: after a funding round, at the start of a budget year or after a major contract. Then it goes quiet again. That makes fixed overhead a risk.
So organise two layers: a fixed base recruitment team for the steady flow, and flexible capacity for the hiring peaks. Think of it like a restaurant. You staff the kitchen for a normal evening, and bring in extra hands for the busy weekends.
Think of it like a restaurant. You staff the kitchen for a normal evening, and bring in extra hands for the busy weekends.
The right recruitment capacity depends on several factors:
- Your growth ambitions
- How your hiring peaks move (can you predict hiring peaks?)
- How many hours your team can spend on hiring
- How complex the roles are
- And how many roles you’re filling at once
But one principle always holds: build for your base hiring needs, and add flexible support for the peaks. Here’s how that looks in each phase:
Phase 1 (founder-led): the wave comes once, after a growth moment. Absorb it flexibly. A full-time recruiter hired for that wave will have little to do a few months later.
Phase 2 (first HR lead): replacements now create a steady flow underneath the hiring peaks. Build a small fixed base, and budget for extra capacity around your peak hiring moments.
Phase 3 (structuring for scale): the base flow is large and predictable. A fixed core makes sense now, with a flexible layer on top.
Whatever your phase, arrange it before the wave hits. Look at your hiring plan for the coming months, and learn your own rhythm: when do the waves come, and how big is the steady flow in between? If you only arrange capacity once the wave arrives, you’re always behind.


